Saturday, September 4, 2010

Upstairs Bathroom




Hope everyone had an enjoyable Labor Day Weekend! This is how we spent ours....demo in the upstairs bathroom.






Remember that orange counter top? It is up for grabs in our front yard! :)

Sinks from Home Depot:


Rather than deal with hours of wallpaper removal, spackling and sanding, we opted to strip the walls down to the studs and put up new drywall on two of the walls. Zach measuring the drywall:
Making sure the drywall is level:

Side by side sinks....temporary install so we can get ready for work this week.


Ripping up the floor:
New Floor:

Mary's handy electrical work:
One last "before" photo....
After:

Blue won on the poll we posted on here so we tried it out. We are not SURE about the color but we will keep it for a while until it drives us crazy or we get used to it. We still have more to do such as lighting. moulding and baseboards but the major stuff (vanities, plumbing, electrical, floor, walls) are done..... :)

2 comments:

  1. Wow, you guy are fast!! How did you get all that done in 1 week?? It didn't like like that last Sunday night!!! You are fast workers! IT looks great!! And if you decide you can't handle that intense of a blue, maybe a lighter blue would work? I think that would still look great with the cabinets and shower curtain.
    Great job on the house...now put down that paint brush and sit on your couch with some wine and enjoy it!! :)

    ReplyDelete