Well Saturday was the end of week 1. The structural engineer came, as well as Mark Traver to look at the house. Basically it was a mixed report. Our plans are doable on the first floor, however the 2nd floor and attic would be a major undertaking so we will most likely just repair as-is (still fixable just not in line with the "big plan").
Top: Dad relieving a little stress

So overall it was a productive weekend. We jacked the foundations of the house, eliminated 1 wall, finished scraping the "yellow stuff", and made multiple trips to our free Dumpster. Dad also outsourced a little help so we also have the 2nd floor hallway ceiling torn down.













LtoR: Zach Demo; Wall to be removed LR & DR; Wall Removed LR & Kitchen