Well, I lied. I'm posting again and we're not finished. (Cause a few people have asked to see the floors.) So we learned the secrets to laminate floors; most of all make sure your lower back is ready for a beating!!
Wednesday, February 24, 2010
Sunday, February 21, 2010
Week 5
Well as you probably figured out, we moved our moving date. The truck is now the 27/28th so we have a little more time to work on the house. The roofers are basically finished so no more leaks! Dad and I have also been making progress. This will probably be the last picture until everything is finished.
And non-house related, but Mary got a new car this week!(Bye bye BMW:(, Hellooooo Lexus!
Mary will post pictures of her new suv soon Im sure.
Sunday, February 14, 2010
Well weeks 3 and 4 went by very quickly. Mary came to visit for Valentines day!
After hours of sanding wallpaper off and spackling and resanding.
Doing some major work on the roof.
There has been a hole in the roof for years and after a while it rotted a lot of the frame.
Doing some major work on the roof.
There has been a hole in the roof for years and after a while it rotted a lot of the frame.
Dad had actually hired Laman Roofing to do the repairs before we even decided to move, he just took a while to get here.
Finally, we got the LVL beam at Belknap!
Finally, we got the LVL beam at Belknap!
Before we could put the beam in we had to finish jacking/ leveling the foundations and add a post to support the new header.
Got the beam in place, leveling it, and building supports.
After hours (3.5) of work on 2/7 we got the beam finished. I feel like there was a game or something we were suppose to watch today?? lol. (Watched the superbowl for 10 min at Dunkin Donuts.)
Got the beam in place, leveling it, and building supports.
After hours (3.5) of work on 2/7 we got the beam finished. I feel like there was a game or something we were suppose to watch today?? lol. (Watched the superbowl for 10 min at Dunkin Donuts.)
Thursday, February 4, 2010